What Our Clients Are Saying

ACE Glass Construction Corp

Our cut optimization on this project was configured with 320' stock length material. Due to an error in fabrication, we had to reconfigure our splice joints and found out that the 320" mullions would have to be cut up to meet the new engineering criteria, allowing more waste than originally planned. This left us short on material and our vendor was 4-6 weeks out getting this material shipped to us. Our vendor turned us on to Aluminum Storefront Anywhere and after communicating with JC Davis, we were ably to set up shipping and have material available the following week. Price was fair and communication was easy. 
It was a win for us to meet a hard deadline on this project. – Dan Meeks 
 

Metropolitan Glass

ASFA has come in clutch in several recent scenarios. Whether a part is damaged, miss-cut, or out of stock, we have been able to complete high priority projects thanks to the resources that ASFA connected us to. We've been able to assist other glaziers in a bind as well. This is a great concept, and a great way to access a vast pool of resources to get work done! – Daniel Sharpe

Window Systems of Texas

Window Systems of Texas, Inc, needed to finish a project at IAH Terminal C Parking Garage and we ran out of Kawneer 27850 Gasket. We couldn’t get the Gasket from Kawneer quick enough to complete the project. We had to finish that day and would incur extra fees for the swing stage we had onsite. I sent an email to ASFA requesting this Gasket, and by the end of the day, we had the Gasket picked up and installed. ASFA really helped us out and we completed the project on time and with no delays or extra fee’s.–Jason Cameron

Narramore Glass & Contracting

“We were in a pinch and needed a curtainwall mullion sooner than the manufacturer could deliver. ASFA came through for us and we got the job done!”–James Beylotte

Â